Thermon ZP-R-WP Bedienungsanleitung Seite 2

  • Herunterladen
  • Zu meinen Handbüchern hinzufügen
  • Drucken
  • Seite
    / 4
  • Inhaltsverzeichnis
  • LESEZEICHEN
  • Bewertet. / 5. Basierend auf Kundenbewertungen
Seitenansicht 1
2
Tools Required . . .
1
2
4
3
5
Dimensions . . .
10
8
Item Quantity Description
1 1
Expediter Assembly
Support Cap with O-Ring
Threaded Grommet Compressor
Grommet
Support Base with O-Ring
2 1 Junction Box Lid
3 1 Junction Box Base with O-Ring & M25 Dust Cap
4 1 Nut
5 1 Banding
6 1 Terminal Block and Bridge (separately)
7 1 Junction Box Cord
8 1 Blind Plug
9 1 Bracket
10 3 Screws
11 3 Washers
3 mm
8 mm
28 mm
33 mm
Warnings . . .
• Due to the risk of electrical shock, arcing andre
caused by product damage or improper usage,
installation or maintenance, a ground-fault protection
device is required.
Installation must comply with Thermon requirements
(including form PN 50207U for Ex systems) and be
installed in accordance with the regulations as per the
norm EN IEC 60079-14 for hazardous areas (where
applicable), or any other applicable national and local
codes.
• Component approvals and performance ratings are
basedontheuseofThermonspeciedpartsonly.
De-energize all power sources before opening
enclosure.
Avoid electrostatic charge. Clean only with a damp
cloth.
Keep ends of heating cable and kit components dry
before and during installation.
• Minimum bending radius of heating cable is ve (5)
times the cable outer diameter.
Individuals installing these products are responsible
for complying with all applicable safety and health
guidelines. Proper Personal Protective Equipment
(PPE) should be utilized during installation. Contact
Thermon if you have any additional questions.
Order Separately . . .
IEK Insulation Entry Kit (per cable)
IEK-TES-1 OR 2 for TESH and TES(X)L
7
Order Separately . . .
PETK Power and End Termination Kits (per cable)
PETK-5 for direct connection
PETK-10 & 11 for cold lead connection
6
11
9
Terminator
TM
ZP-R-WP INSTALLATION PROCEDURES
The following installation procedures are suggested guidelines
for the installation of the Terminator ZP-R-WP Kit. For
translations other than English and local language translation
provided here, please contact Thermon. The English
language installation procedure shall govern.
Kit Contents . . .
Receiving, Storing and Handling . . .
1. Inspect materials for damage incurred during
shipping.
2. Report damages to the carrier for settlement.
3. Identify parts against the packing list to ensure the
proper type and quantity has been received.
4. Store in dry location.
Terminator-LN-Tool
(order separately)
190mm
50mm
155mm
200mm
205mm
Certications/Approvals . . .
1725 II 2 GD Ex eb IIC T4-T6, Ex tb IIIC T135°C-T85°C FM10ATEX0058X
IP66
-60°C≤Ta≤+55°C
Ordinary & Hazardous Locations
Seitenansicht 1
1 2 3 4

Kommentare zu diesen Handbüchern

Keine Kommentare